Two-Level Suspended Board Ceiling

A plasterboard ceiling hung below the structure on top cross rails, with furring channels that carry the boards. Room size and plenum height Board thickness, size and layers Rail, channel and hanger spacing Wall track or none

Details

Category: Plasterboard › Suspended Board Ceilings

By Huu Khanh Nguyen · Updated November 4, 2026

Parameters

NameDefaultUnit
Width4800mm
Depth3600mm
Plenum Height1100mm
Board Layers1
Board Thickness13mm
Board Width1200mm
Board Length2400mm
Board Finish#ffffff
Furring Channel Spacing600mm
Furring Channel Edge DistanceendClearance + 25.565mm
Furring Channel Depth27.3mm
Top Cross Rail Spacing1200mm
Top Cross Rail Edge Distance200mm
Top Cross Rail Depth26.35mm
Top Cross Rail Thickness0.75mm
Hanger Spacing1200mm
Hanger Distance From Rail End300mm
Wall Clearance At Member Ends10mm
Stock Length3600mm
Framing Finish#ffffff
Board StackboardLayers * boardThicknessmm
Rail LinesMath.ceil((sizeY - 2 * primaryEdge) / primarySpacing) + 1
Rail Pitch(sizeY - 2 * primaryEdge) / (primaryLines - 1)mm
Rail PiecesMath.ceil((sizeX - 2 * endClearance) / stockLength)
Hangers Per RailMath.ceil((sizeX - 2 * endClearance - 2 * hangerEdge) / hangerSpacing) + 1
Channel LinesMath.ceil((sizeX - 2 * furringEdge) / furringSpacing) + 1
Channel Pitch(sizeX - 2 * furringEdge) / (furringLines - 1)mm
Channel PiecesMath.ceil((sizeY - 2 * endClearance) / stockLength)
Track PiecesMath.ceil(sizeX / stockLength)
Face Joint Offset(boardLayers >= 3 || (boardLayers == 2 && furringSpacing > 450)) ? 1 : 0
Sheet BaysMath.floor((boardLength - furringEdge) / furringPitch)
Row Count1 + Math.ceil(sizeY / boardWidth)
Column Count2 + Math.ceil((furringLines - 1) / sheetBays)