By Huu Khanh Nguyen · Updated October 28, 2026 · gabion, gabion column, wire mat, fence, pier, stone filled
A straight run of stone filled wire columns with a double wire mat hung between each pair. Run length and column spacing Equal bays, bays of a set spacing, or bays of a set gap Height Wire finish
| Name | Default | Unit |
|---|---|---|
| Run Length | 5000 | mm |
| Depth | columnWidth | mm |
| Height | 1800 | mm |
| Bay Width | 2000 | mm |
| Distribution | count | |
| Wire Finish | white | |
| columnWidth | 260 | mm |
| span | sizeX - columnWidth | mm |
| pitchNominal | distribution == 'gap' ? bayWidth + columnWidth : bayWidth | mm |
| bays | distribution == 'count' ? Math.max(1, Math.ceil(span / pitchNominal - 0.000001)) : ((span - Math.floor(span / pitchNominal + 0.000001) * pitchNominal) < columnWidth + 100 && Math.floor(span / pitchNominal + 0.000001) >= 1 ? Math.floor(span / pitchNominal + 0.000001) : Math.floor(span / pitchNominal + 0.000001) + ((span - Math.floor(span / pitchNominal + 0.000001) * pitchNominal) > 0.000001 ? 1 : 0)) |